Huge transport will close Monroe road Monday

A contractor will be moving an extremely heavy load from a rail yard to the new NTE Energy site on Monday, which will require some road closures.

North Main Street between Todhunter Road and East Garver Road will have intermittent closures from 4 a.m. to 1 p.m. Monday, Feb. 20.

One lane of traffic will be maintained in each direction for the majority of this time except for when the load is crossing the bridge or rotating the moving equipment in to position.

Police officers will be posted at each end of the project area during this time.

About the Author